Our services
Your piping and maintenance partner.
Steel and metal piping






Plastic and non metallic piping
Shutdown support
Sanitary piping
Stainless steel piping
Galvanized iron
Carbon steel
Mild steel
Copper tubing
PVC
FRP
PE/ HDPE
PP
ABS
Equipment shutdown support
Repair and modification work
Our customer map

Our standard
Every project we deliver comes with complete documentation — because proper records protect your facility, support your audits, and ensure the work can be maintained correctly long after we leave the site.


Job safety analysis (JSA/JSEA)
Prepared before work begins, our JSA/JSEA identifies site-specific hazards and control measures — ensuring every team member understands the risks and how to work safely.
Method of statement (MOS)
A step-by-step breakdown of how the work will be carried out, submitted for client approval before mobilisation — so there are no surprises on site.
Work completion report
You can have clear documentation for your files and future reference.




CAD/ ISO drawing
Prepared prior to works for client confirmation and approval — ensuring scope, dimensions, and routing are agreed before installation begins, reducing the risk of rework on site.
Design records
Safety measure
As-built drawing
Issued upon project completion to reflect the actual installed condition — providing accurate documentation for future maintenance, modification, or audit purposes.


Pressure testing report
Conducted upon completion of piping installation to verify system integrity before handover — with full test results documented and submitted as part of the project record.


Contacts
NO. 36, JALAN MUTIARA EMAS 5/11,TAMAN MOUNT AUSTIN, 81100, JOHOR BAHRU, JOHOR